Monday, 1 July 2013

ISRO launches Prestigious Project PSLV-C22

Posted by Siva Kumar Ari
 Isro is gearing up for its two prestigious launches including Polar Satellite Launch Vehicle (PSLV C22) on July 1 at 11.41pm and Geosynchronous Satellite Launch Vehicle (GSLV-D5) on August 6 from its two launch pads at Satish Dawan Space Centre in Sriharikota.  Final review of PSLV-C22 to launch the navigational satellite IRNSS-1A was completed on Thursday and it is all set for launch on July 1 at 11.41 pm
                               Here are the complete details of PSLV-C22










PhotoGallery from the ISRO Station

BOTTOM MOST SEGMENT OF PSLV-C22 BEING PLACED ON LAUNCH PEDESTAL
BOTTOM MOST SEGMENT OF PSLV-C22 BEING PLACED ON LAUNCH PEDESTAL

FULL VIEW OF PSLV-C22 ON FIRST LAUNCH PAD
FULL VIEW OF PSLV-C22 ON FIRST LAUNCH PAD


HOISTING OF ONE OF THE SEGMENTS OF PSLV-C22 FIRST STAGE
HOISTING OF ONE OF THE SEGMENTS OF PSLV-C22 FIRST STAGE

JOINING OF TWO SEGMENTS OF PSLV-C22 FIRST STAGE IN PROGRESS
JOINING OF TWO SEGMENTS OF PSLV-C22 FIRST STAGE IN PROGRESS

MOBILE SERVICE TOWER CONTAINING FULLY ASSEMBLED PSLV-C22 FIRST STAGE
MOBILE SERVICE TOWER CONTAINING FULLY ASSEMBLED PSLV-C22 FIRST STAGE

ONE OF THE STRAP-ON MOTORS OF PSLV-C22 BEING TAKEN INTO MOBILE SERVICE TOWER
ONE OF THE STRAP-ON MOTORS OF PSLV-C22 BEING TAKEN INTO MOBILE SERVICE TOWER

PANORAMIC VIEW OF PSLV-C22 ON THE FIRST LAUNCH PAD
PANORAMIC VIEW OF PSLV-C22 ON THE FIRST LAUNCH PAD

PANORAMIC VIEW OF PSLV-C22 ON THE FIRST LAUNCH PAD
PANORAMIC VIEW OF PSLV-C22 ON THE FIRST LAUNCH PAD

PSLV-C22 ASSEMBLED UPTO SECOND STAGE INSIDE MOBILE SERVICE TOWER
PSLV-C22 ASSEMBLED UPTO SECOND STAGE INSIDE MOBILE SERVICE TOWER

PSLV-C22 FIRST STAGE IGNITER BEING HOISTED
PSLV-C22 FIRST STAGE IGNITER BEING HOISTED

PSLV-C22 GIANT FIRST STAGE WITH SIX STRAP-ONS INSIDE MOBILE SERVICE TOWER
PSLV-C22 GIANT FIRST STAGE WITH SIX STRAP-ONS INSIDE MOBILE SERVICE TOWER

PSLV-C22 INSIDE MOBILE SERVICE TOWER DURING FINAL STAGES OF VEHICLE INTEGRATION
PSLV-C22 INSIDE MOBILE SERVICE TOWER DURING FINAL STAGES OF VEHICLE INTEGRATION

PSLV-C22 LIQUID SECOND STAGE
PSLV-C22 LIQUID SECOND STAGE

PSLV-C22 ON THE FIRST LAUNCH PAD WITH MOBILE SERVICE TOWER AT A DISTANCE
PSLV-C22 ON THE FIRST LAUNCH PAD WITH MOBILE SERVICE TOWER AT A DISTANCE

PSLV-C22 SECOND STAGE LIQUID ENGINE BEING LOWERED INTO THE INTERSTAGE
PSLV-C22 SECOND STAGE LIQUID ENGINE BEING LOWERED INTO THE INTERSTAGE

View of PSLV-C22
View of PSLV-C22

Video of ISRO Polar satellite Launch Vehicle PSLV C22  ::


0 comments:

Post a Comment